Strategic Industrial Zone Holešov Begins Extensive Infrastructure Construction
3. 3. 2025
One of the most significant investment projects for the next few years was launched in the Strategic Industrial Zone Holešov in January of this year. The project, entitled “SPZ Holešov – Construction 11 – Technical and Transport Infrastructure within SPZ Holešov – West and Center”, will bring extensive modifications to the transport and technical infrastructure, which will significantly increase the attractiveness of this location for new investors.
The construction work includes the construction of roads, cycle paths and sidewalks, which will ensure better connectivity of individual parts of the industrial zone and improve access to future production and logistics facilities. An integral part of the project is also the modernization of engineering networks, including water supply, sewage, gas, high-voltage power lines and communication cables. The project also includes the installation of public lighting, which will increase the safety and comfort of users of this area, and comprehensive landscaping that will contribute to the ecological stability of the area.
The total cost of this large-scale investment is approximately CZK 254 million excluding VAT. The project is partly financed by subsidies from the Ministry for Regional Development within the Integrated Regional Operational Programme (IROP 2021–2027), while financial support for the supply and subsequent care of green planting was also provided by the Ministry of the Environment through the Operational Programme for the Environment (OPŽP 2021–2027).
“The aim of this investment is not only to increase the technical equipment of the industrial zone, but also to create an attractive and easily accessible environment for new business entities. Modern infrastructure is a key prerequisite for the further development of the Zone and attracting strategic investors,” said Radovan Macháček, Chairman of the Board of Directors of the Holešov Industrial Zone.
The project is implemented by the association EUROVIA CZ a.s., KKS, spol. s r.o. and SMO, a.s., with completion scheduled for May 2026.
This project represents another step in the long-term development strategy of the Holešov Business Zone, which aims to offer companies a modern, environmentally sustainable and fully equipped space for doing business. With the gradual development of infrastructure, the Zone is becoming an increasingly attractive place for investors from various industries, thereby significantly contributing to the economic growth of the entire Zlín region.